Low-carbon Community Hub Achieved by Engineered Timber at the heart of London
King's Cross W3

Image Credit: London Architectural Photography
Upfront embodied carbon (A1–A5): 562.48 kgCO₂e/m² (without sequestration), 177.88 kgCO₂e/m² (with sequestration)
Design Life: 60 years
End of Life: Mass timber structural elements designed for potential disassembly and reuse within whole-life carbon assessment scenarios
Construction Process: Prefabricated engineered timber structural system assembled on site to reduce construction emissions