Community/ Mixed-use
Low-carbon Community Hub Achieved by Engineered Timber at the heart of London
King's Cross W3

Image Credit: London Architectural Photography
Upfront embodied carbon (A1–A5): 562.48 kgCO₂e/m² (without sequestration), 177.88 kgCO₂e/m² (with sequestration)
Design Life: 60 years
End of Life: Mass timber structural elements designed for potential disassembly and reuse within whole-life carbon assessment scenarios
Construction Process: Prefabricated engineered timber structural system assembled on site to reduce construction emissions
Project Team
Location
Year Completed
Project Value
Awards
Sources
More Stories
More articles you may find useful, carefully selected from our journal




